The best Side of NICEIC approved electricians UK
The MCBs should be clipped on to the Din bar as well as the busbar into a existing flowing terminal and tight screwed to present current into the MCBs.Two sixteen/25mm tail cables, a single neutral and the other Lively are connected to the principle double pole switch of the meter. The most crucial earth cable must be screwed into the earth block,